Maintenance of ventilation systems requires special knowledge and skills. Only organizations and persons who have received a special license can engage in this type of activity. Ventilation is serviced on the basis of a signed contract, which lists all work and the timing of their implementation. There is a certain procedure for the maintenance of ventilation systems. The list of performed work on ventilation maintenance is recorded in the log.
- Ventilation service license
- Maintenance contract for ventilation systems
- Ventilation maintenance schedule
- Schedule of maintenance work on fans in ventilation systems
- Regulations for the maintenance of air filters and heaters of the ventilation system
- Regulations for the maintenance of automatic units of supply ventilation systems
- Ventilation system operation and maintenance log
- Maintenance and repair log of ventilation systems in accordance with form 43-e
- Security measures
Ventilation service license
All persons and organizations involved in the maintenance of ventilation systems, in accordance with the federal law "On licensing certain types of activities" must obtain a license.
To obtain a license to maintain ventilation systems, you must submit the following documents:
- A copy of the charter, certified by a notary.
- A copy of the memorandum of association, certified by a notary.
- A copy of the certificate of issuance of the PSRN, certified by a notary.
- A copy of the certificate of TIN / KPP issue, certified by a notary.
- A copy of the certificate of amendments to the Unified State Register of Legal Entities, certified by a notary.
- A copy of the certificate of assignment of the OKVED code from the State Statistics Committee, certified by a notary.
- Extract from the state register, received no more than 14 days in advance, certified by a notary.
- Copies of documents on changes in the statutory documentation, appointment of the general director, creation of an enterprise.
- A copy or original of a lease agreement or a document of ownership of the occupied premises.
- A copy of the education document of the CEO.
- Copies of documents on the education of specialists.
- Settlement accounts.
- Data of passports of specialists and general director.
The form of a license for the maintenance of indoor ventilation is standard.
Documents for obtaining a license for servicing indoor and other types of ventilation are considered from 30 to 45 days. After obtaining a license, the organization can service ventilation in any subject of the federation.
Maintenance contract for ventilation systems
The contract for the maintenance of ventilation systems is concluded between the customer and the contractor.
A typical ventilation system maintenance contract contains the following clauses:
- Subject of the contract.
- Duties of the parties.
- Cost of work, calculation scheme.
- The procedure for acceptance and delivery of the work done.
- Responsibility of the parties.
- Settlement of disputes.
- Final provisions.
- Addresses and requisites.
- Applications.
The annexes to the contract indicate a list of ventilation maintenance work, the frequency of their implementation, and the validity period.
The agreement is accompanied by a protocol for agreeing prices for work on the maintenance of the supply and exhaust system and the rules for their implementation.
Ventilation maintenance schedule
The standard work procedure for the maintenance of ventilation determines the list and frequency of work for each individual module:
- fans;
- air heaters;
- filters;
- flaps;
- electrical parts;
- controllers.
Supply and exhaust ventilation is serviced after signing the contract and approving the regulations.
Schedule of maintenance work on fans in ventilation systems
P / p No. | Name of works | Periodicity |
1 | Visual control of work with fixation of results. | Once every 3 months |
2 | Installation of the presence of uncharacteristic sounds, overheating above +70 degrees and vibration with a written record of the results. | Once every 3 months |
3 | Visual control of bending elements with fixation of results. | Once every 3 months |
4 | Check all moving parts and fastenings with nuts, bolts and others. | Once every 3 months |
5 | Checking fasteners and anti-vibration mechanisms. | Once every 3 months |
5.1 | Inspection of all mountings. | Once every 3 months |
5.2 | Fixing the detected defects in the ventilation maintenance log. | Once every 3 months |
6 | Detection of abnormal sounds and bearing overheating. | Once every 3 months |
7 | Investigation of the condition of belts, their location, degree of tension. Replacement if necessary. | Once every 3 months |
8 | Inspection of engine insulation. The data is recorded in the ventilation maintenance log. | Once every 3 months |
9 | Current monitoring with data fixation. | Once every 6 months |
10 | Study of electrical wiring, wire connections with the fixation of the results in writing. | Once every 3 months |
11 | Investigation of air paths of the fan, cleaning from dust deposits. | Once every 3 months |
12 | Cleaning the fan impeller with fixing the identified breakdowns in the ventilation maintenance log. | Once every 6 months |
13 | Cleaning the outside of the fan. | Once every 12 months |
14 | Drawing up a report on the degree of wear and tear of equipment. | Once every 3 months |
Regulations for the maintenance of air filters and heaters of the ventilation system
Heaters
1 | Inspection and detection of breakdowns, contamination. | Once every 3 months |
2 | Control of the uniformity of heating the sides. | Once every 3 months |
3 | Search for coolant leaks, repair. | Once every 3 months |
4 | Pumping air from the circuit. | Once every 3 months |
5 | Removing dirt and dust from the coil. | Once every 3 months |
Air filters
1 | Turn off the fans. | Once every 3 months |
2 | Inspection of the condition of the filter surfaces. | Once every 3 months |
3 | Replacement of filter modules if necessary. | Once every 3 months |
4 | Record of all identified defects and malfunctions in the ventilation system maintenance and repair log. | Once every 3 months |
Regulations for the maintenance of automatic units of supply ventilation systems
Dampers
1 | Inspection and troubleshooting. | Once every 3 months |
2 | Closing and opening tightness control. | Once every 3 months |
3 | Repair and dust removal. | Once every 3 months |
Electromechanisms
1 | Opening and closing control. | Once every 3 months |
2 | Investigation of the degree of wear. | Once every 3 months |
3 | Checking the condition of the wire connections, strengthening them. | Once every 3 months |
4 | Feedback check. | Once every 3 months |
5 | Control or change thresholds. | Once every 3 months |
Controllers
1 | Monitoring of power indicators, safety of fuses. | Once every 3 months |
2 | Control of initial parameters and settings. | Once every 3 months |
3 | Change the initial parameters and settings as needed. | Once every 3 months |
4 | Research of controller operation. | Once every 3 months |
5 | Checking the wire connections, strengthening them. | Once every 3 months |
6 | Testing the interaction of executive units and sensors with the controller. | Once every 3 months |
7 | Detection of contamination. | Once every 3 months |
8 | Elimination of contamination. | Once every 3 months |
Hydrostats, thermostats and sensors
1 | Calculation of characteristics at the output, their compliance with the norm. | Once every 3 months |
2 | Checking the fastening of the wires and their reinforcement. | Once every 3 months |
3 | Replacement or repair as needed. | Once every 3 months |
4 | Search for contamination. | Once every 3 months |
5 | Elimination of contamination. | Once every 3 months |
Ventilation system operation and maintenance log
The maintenance and repair log of the ventilation system is one of the necessary documents along with the Passport of the ventilation unit and the Operation log. All measures for the repair and maintenance of ventilation systems are recorded in the journal. It is he who is the main regulatory document.
The design of the magazine is carried out by specialists who carry out the work. A preliminary contract for the maintenance of the ventilation system is concluded between him and the company. They draw up an Act of technical condition, which indicates the main parameters of the system and its condition at the time of the survey.
Based on the Act, recommendations are drawn up for the maintenance of supply and exhaust ventilation.
Maintenance and repair log of ventilation systems in accordance with form 43-e
No. of ventilation system, type of equipment. | Number and type of service (overhaul or maintenance) | List of faults | Completed work | Signature | |
executor | controlR | ||||
1. | |||||
2. |
Security measures
Maintenance of ventilation is carried out strictly according to the approved schedule, coordinated with the operating mode of the enterprise and the recommendations of the equipment manufacturer.
- The equipment is started and stopped in a certain sequence, which ensures the complete removal of harmful substances from the premises and air ducts.
- The guide assemblies on the fans are checked once every 4 weeks.
- Air heaters are checked for leaks every 10 days.
- If, during maintenance of cell oil filters, it is found that their resistance increases by ½ or the dust content in the oil reaches 0.16 kilograms per liter, the oil should be changed, and the filter surfaces should be rinsed with 10% caustic solution.
- It is necessary to check the clogging of the ventilation grids and grids at least once every 3 months.
- During servicing of the ventilation system sound attenuators, the integrity of all components, the tightness and the tightness of the structure should be checked. If the sound-absorbing material has collapsed, the missing pieces must be restored.
Video about cleaning, disinfection and maintenance of ventilation:
Is it possible to obtain a license for the maintenance of existing ventilation systems by a specialist within the enterprise and under what conditions?
If I understand correctly, you do not need a license. It is needed if you will work and maintain a fire (smoke) ventilation system. In this case, it is impractical to do this, it is easier and cheaper to find a contractor.
Good day!
Please tell me if there are any regulatory documents obliging the organization to have a separate contract for ventilation maintenance for reporting to the supervisory authorities (fire supervision, Rospotrebnadzor)?
Those. are you required to have a service contract? Of course not.
When checking, the ventilation system must be in the required technical condition, that's what you need.
Please tell me. Management Company. Two employees have Minarhstroy certificates (a specialist responsible for the safe operation of gas facilities (housing stock) and the second who passed the exam on knowledge of the rules for the production of pipe and furnace work and is admitted to work on the maintenance of chimneys and ventilation ducts). The house is not equipped with gas stoves. Is the ventilation system a fire extinguishing and smoke removal system and is an EMERCOM license needed to check ventilation ducts in this case? If possible with links to articles.Thanks
Hello.Unfortunately, your question is highly specialized and we cannot answer it reliably, so as not to expose you and your employees to risks and fines.
Yes, a license from the Ministry of Emergencies is needed. It is spelled out in the 410 government decree. If memory serves.
Good day.
What documentation for the ventilation system should be at the meat processing plant.
Thank you.